A machine relocation route must accommodate the load, handling equipment, turning radius, floor capacity, and working team.
Practical safety checks
- Measure doors, corridors, corners, slopes, and overhead clearance.
- Verify floor capacity and protect sensitive surfaces.
- Remove obstacles and control nearby production activity.
- Plan stopping points and emergency escape space.
- Walk the final route with the full relocation team.
The route should be proven before the first jack, skate, or forklift movement begins.
GIGAMACH SDN BHD supports machine relocation, heavy lifting, rigging, gantry lifting, hydraulic jacking, and industrial equipment positioning with a practical safety-first approach.